As part of the refurbishment of this prominent CBD tower, a steel structure was required to support the new lighting and ceiling features for main entrance of the building. The steel frame was carefully analysed by NITMA Consulting engineers to achieve the optimum design, which minimised the additional weight to the existing building structure.
Architect: Crone Partners
Builder: Built
